Archive

Archive for June 8th, 2009

Titan Motorsports New Location Update 3

June 8th, 2009 Comments off

We’re getting much closer to move-in, the warehouse is setup and ready to go, and with a few finishing details and we’ll begin our fun moving process. The biggest updates this week came from the flooring being installed in various departments throughout the building.

The wood flooring was installed in the showroom, we opted for a dark wood to contrast with the walls and match the stainless and black fixtures that will decorate the walls.

The shop side of the warehouse received it’s epoxy coat with polyurethane clear. We’ll be finalizing the layout of equipment

The bathrooms received slate gray tile and their appropriate fixtures.

Our carpets arrived for the call center and offices, rather than go with a neutral color we opted for a high end designer carpet which takes cues from the green in the walls.

Our shipping manager Kris has his own fabricated office in the back of the warehouse to make deliveries much more convenient. The office can easily be moved to different portions of the warehouse should we ever need to reconfigure the shipping and receiving area.