Archive

Archive for December 15th, 2008

Tough Brakes for Project 996TT

December 15th, 2008 Comments off

While we were at PRI, our Stoptech Big Brake kit arrived for Project
996TT. The factory brakes on the car felt very tired and needed an overhaul
and some new pads, so we opted for an upgrade. We’ve used Stoptech kits on many
project cars in the past as well as other brake manufactures and they offer a great
overall product. The Kits include 2 piece floating rotors,ST-60 and ST-40 calipers,
stainless brake lines, mounting brackets, and street performance pads. The front rotors
are 380mm, the rears 332mm. They should look great behind the HRE monoblocks, and offer
great braking when we shake down the project soon at the road course.

We also will have the pleasure of testing Tiltons newly released brake fluid, TSR-1 Supreme. This race tested and proven fluid has an extremely high boiling point of 622 degrees Fahrenheit, meets all DOT4 specifications, and maintains very low compressibility at high temperatures. This fluid should be released to the public in February of 2009 at which point we will receive our first shipment as well. Tilton will also be Offering TBR-1 Brake fluid and an all new TCR-1 clutch specific fluid.

A Sign of the Times

December 15th, 2008 1 comment

With the PRI show in Orlando this past week, we had the pleasure of hosting an open house for the great vendors who serve Titan Motorsports. The open house was hosted at our new location which is currently under construction on Boggy Creek Road, and displayed a handful of street and race cars. This state of the art 25,000sq/ft facility is being designed and built from the ground up with extensive planning to ensure growth for each of Titans divisions for many years to come.

The exterior shell has been complete for some time, however permitting for the interior buildup has held up construction progress. As these conflicts are now resolved, we are getting much closer to moving to our new home, and look forward to posting many more updates as construction continues. Our current expectations anticipate a smooth transition towards the end of quarter 1 in 2009.

We reached a major milestone in construction this week with the hanging of our massive new sign. The sign features 42” tall brushed aluminum letters which are backlit by thousands of amber LEDs. A big thank you to Nick and the crew at Diamond Electric for creating such a master piece and having it hung in time for our open house.