Archive

Archive for May 5th, 2009

Titan Motorsports Camo 996tt w/ K24/18G – 712rwhp @ 1.48 bar

May 5th, 2009 Comments off

712rwhp @ 1.48 bar ……In 94 degree heat.

We’ll be Shipping the car to Puerto Rico for a drag race on May 30th and needed to get a good tune-up in the car before she ships off Thursday. Darin has been working hard to get the Motec and factory ECU to co-operate with each other and get the car tuned. After a few hours on the ECU the car was running excellent and manged to make 712rwhp @ 1.48bar in the 97 degree heat we where blessed with today. The car is running on VP C16 fuel, and still has quite a bit left, however with the shipping deadline looming we where simply out of time to do anymore tuning. I want to thank Tony@EPL for helping us remove some fail safes in the factory ECU and his great advice along the way. I’m still impressed that the old girl is running so well with over 66k miles on the odometer and a completly factory engine. If all goes as planned we expect to hit the local test and tune tomorrow before loading the car up.

Setup :
Stock Engine, never been opened up, 66k miles
-K24/18G
-Second Bosch 044 inline in Fuel Filter spot
-Motec M800 / EPL Motronic ECU
-Tial BOV
-AWE Straightpipes
-Injector dynamics 1,000cc Injectors
-USP Intercoolers
-Titan Motorsports Intake Fenderwell intakes

Titan Motorsports New Location Construction Update

May 5th, 2009 1 comment

Anyone who has been to our current location at Goldenrod and 50 will be the first to tell you that we outgrew this space many moons ago. The new building was purchased over a year ago, however permitting and construction delays have pushed our anticipated move back many times now. Fortunately our current progress is on track and we should be moving into this beautiful 25,000sq/ft facility in the next 1-2 months. Our entire operation will now be located under one roof with plenty of room for future expansion.

Here are some recent snapshots showing the progress of our build out at the new Boggy Creek location near Orlando International Airport. We’ve finally hit the home stretch and are now in the final finish work stages, if all goes as planned we should be moving in less than 45 days. I will post more picture updates as the date draws near and we hit new construction milestones.